Agrotop Layer Houses and Broiler Houses

Spiral newest neighbors impose greater amount of cast in one structure, using advanced equipment that allows it. System consists of cells that impose on the concrete floor of the building, up to 8 floors one on the other. Such an arrangement allows the housing of laying up to 70,000 square structure only approximately 1,000 sqm. Larger buildings, will increase the amount of adjustment.
At full capacity, such a structure must be in a forced ventilated and includes advanced weather systems, but you can get there in stages. Those interested in it, can be initially set up a structure with a mesh walls and curtains, which will consist of only 3 or 4 floors of cells, so that the building will function by about 40-50% full Rex. Coop building height is approximately 6 m, so that you can assemble equipment to a height approximately 5 m and allow more free height needed for ventilation.
The final configuration coop walls insulated panels are made, and the roof of the building also is isolated by cutting Foleoritan on the inner ceiling cans, turn the top. Integrated longitudinal walls and air inlet cooling systems.
Booster installed the roof crown of my head that allows a combination of roof ventilation complete ventilation system. Because of the large quantity of poultry, the chicken equipped with large mixed containers also store enough drinking water, on top of high water tower's final height appropriate cell floors.


Among the automated systems that operate the coop, the garbage collection is done on a moving film and conveyors, and concrete channel for trash conveyor and elevator is an integral part of building the first stage.
Fattening snails made possible the construction of a larger key than before, and most of the coops now built with a width of 14 or 16 feet. Ventilation system and other internal systems of the building, and do not pose nearly length limit now, so inclined to make long poultry and poultry units to order of between 2,000 and 3,000 sqm building. This size is more economic, in that it takes full all same set of systems, both of which are associated with the structure and ventilation, and those related to force-feeding and drinking equipment.
Due to the many markets fattening snails, requiring evacuation of the building cleaning and garbage, many times a year, and on a tight schedule, emphasizing an quality of the concrete floors of buildings. Floors smoothed and leveled using advanced measuring equipment, and ensure ease of cleaning and washing balance structure.
In most cases, the fronts are made of concrete surfaces of buildings, for the markets and the loading of garbage, and sometimes along the edges of a concrete building to sanitation. The lower part of the walls of the buildings is a wraparound concrete girder skeleton protects the building and the wall because of the damage when mechanically garbage.
Criticism concrete special drains are installed that allow easy removal of the rinse water out of the building. The openings are easy to open, and yet assure complete closure and sealing for growth.
Mast structures are also reflected general features all the advantages of construction method of Agrotop LTD.